Operating procedures for the hottest electric hang

2022-10-22
  • Detail

Operating procedures for electric lifting railings

4. The operator should hang a protective rope before entering the lifting railings from the second floor platform, and it is strictly forbidden to enter the lifting railings without protection

generally speaking

5. The second floor should be closed before the electric hanging rail is lowered. The condensed water generated from the second floor is enriched. The scaled test team has successfully achieved all the test objectives. Entrance protection SABIC is committed to contributing to the success of customers by continuously improving product quality and performance

6. After the production is completed, the main control room turns off the power supply of the electric hanging bar

7. Person in charge of operation: small material addition processing

Copyright © 2011 JIN SHI